Мужчина
Дондюшаны
Чтобы открыть контактную информацию соискателя, нужно зарегистрироваться и оплатить услугу "Доступ к базе резюме".
Загруженный файл CV
Это резюме размещено как файл. Вы смотрите его текстовую версию, которая может немного отличаться от оригинальной.
ABOUT ME
To make a position for myself in the competitive corporate world and contribute to achieving the goals on both professional and personal level.
WORK EXPERIENCE
20 OCT 2013 – CURRENT
Dhaka, Bangladesh
JOB RESPONSIBILITY:
- Lead all the project works.
- Bid documents preparation & submission.
- Check and follow the condition of Contract [FIDIC] with Clients.
- To assist in preparation of the budget & master program of the work and push sub-contractor for the procurement and preparation for upcoming activities in advances to meet time line.
- To prepare IPC, Measurement records etc.
- To prepare Daily Report, Weekly Report, Monthly Report & Work Program.
- To prepare shop drawing, method statement, work plan for execution of work in field level.
- During the work solve the entire related problem discussing with client, consultant & others.
- Responsible for company profit.
1 JAN 2013 – 31 OCT 2013
HEAD OFFICE: No-60B, Jln SS 15/4, Section 15, 47500 Subang Jaya, Selangor D.E., Malaysia
Project Cost Controller BRT Builders Sdn Bhd (A Malaysian based Company)
JOB RESPONSIBILITY:
- Reporting to the Project Manager.
- Preparation of Work Schedule for implementing the project within the time.
- Preparation of S-Curve.
- Preparation of As-Built drawing of various structures.
- Estimation & Requisition for Construction Materials.
- Preparation of Bar Schedule for whole Reservoir, Pump House, Elevated Tank along with Drains, Retaining walls, Guide walls, RCC Railing & Post, Fencing, Guard & Electrical House etc.
- Assisting to prepare Interim Payment Certificate (IPC).
- Preparation of Daily Site Report & Monthly Progress Report.
1 MAR 2011 – 15 DEC 2012
Office: Level-18 UTC Tower, Kawranbazar, Dhaka, Bangladesh
Deputy Assistant Director Shaco International
JOB RESPONSIBILITY:
- Reporting to the Assistant Director.
- Preparation of Bid documents.
- Land Development and Slope Protection Works.
- Preparation of As-Built drawing of various structures.
- Estimation & Requisition for Construction Materials.
- Preparation of Bar Schedule for whole Reservoir, Pump House, Elevated Tank along with Drains, Retaining walls, Guide walls, RCC Railing & Post, Fencing, Guard & Electrical House etc.
- Assisting to prepare Interim Payment Certificate (IPC).
- Preparation of Daily Site Report & Monthly Progress Report.
1 SEP 2009 – 28 FEB 2011
Office: Rowshan Tower (4th floor) 152/2/A-2, West Panthopath, Dhaka, Bangladesh
Project Engineer Hivertech Limited
JOB RESPONSIBILITY:
- Implementation of Plans and Direction of Site Management.
- To follow the quality of works as per Standards & Specification of contract.
- To check the quality of construction materials.
- Preparing Bar Schedule & monthly material consumption.
- Estimation & requisition of construction materials.
- Supervision of bar binding & formwork fixing.
- Planning & Man power scheduling to execute the work by collecting work report.
- Checking of bill of suppliers.
- Evaluation of the offers of contractors and submission to the authority.
- Preparing daily & monthly report.
- Co-ordination with different suppliers to get equipment’s and materials on time and good condition.
EDUCATION AND TRAINING
23 FEB 2005 – 15 JUL 2009
Rajshahi, Bangladesh
Bachelor of Science in Civil Engineering (4-Years Bachelor)
Rajshahi University of Engineering and Technology (RUET), Bangladesh
Field of study: Civil Engineering
Final grade: 3.23 (Out of 4.0)
Number of credits: 160
Thesis: Failure behavior of PVC pipe due to Impact Load
15 JUL 2002 – 30 SEP 2004
Barisal, Bangladesh
Higher Secondary Certificate _HSC
Bauphal Govt Collage, Patuakhali
Field of study: Science
Final grade: 4.20 (out of 5.00)
1 JAN 2000 – 31 DEC 2001
Barisal, Bangladesh
Secondary School Certificate _SSC
Charfession T B High School, Bhola
Field of study: Science
Final grade: 4.13 (Out of 5.00)
LANGUAGE SKILLS
MOTHER TONGUE(S): Bangla
Other language(s):
-
English
- Listening: C2
- Spoken production: C2
- Reading: C2
- Spoken interaction: C2
- Writing: C2
-
Hindi
- Listening: C1
- Spoken production: B2
- Reading: A1
- Spoken interaction: B2
- Writing: A1
Levels: A1 and A2: Basic user; B1 and B2: Independent user; C1 and C2: Proficient user
ADDITIONAL INFORMATION
Hobbies and interests
- Reading book.
- Listening song.
- Social media browsing.
- Watching Movie and Drama.
- Meeting with Family and Friends.
Management and leadership skills
Post Graduate Diploma in Project Management PGDPM
Academy Name: World Academy.
PGDPM (Level - 7, Credit 120)
Result: 3.39 (Out of 4.00) B+
Learner Reg No.: WA-22-02-1995
Certificate No.: 209312
Issue Date: May 5, 2023
Project Management Professional
Academy Name: Ressotta Academy.
Total Training Duration: 40 hr.
Exam not yet completed.
Networks and memberships
1 JAN 2011 – CURRENT
Dhaka
MIEB 30184 Institute of Engineers Bangladesh IEB
Membership No.: 30184
Projects
-
DWSSDP ICB 02.6 under DWASA
Main Contractor: Ludwig Pfeiffer Hoch- und Tiefbau GmbH & Co. KG
Type of Works:- HDPE Pipe (Dia 75mm ~ 315mm) Lying with HDD & Open Cut Method.
- Service Connection/House Connection.
- RCC Chamber & Equipment Installation.
- Pre Commissioning, Commissioning
- All others testing like environment, water test from BUET.
-
FIRST DHAKA ELEVATED EXPRESSWAY (FDEE) PROJECT
Main Contractor: ITALIAN THAI DEVELOPMENT ITD
Type of Works:- Temporary Facilities Works Site Office, Accommodation, Steel Fence and Others Works
- Main Works: Construction of Pile Cap
-
WELL FIELD CONSTRUCTION PROJECT
Main Contractor: HYUNDAI ROTEM COMPANY _HRC
Type of Works:- DI Pipe (Dia 400mm ~ 1200mm) Lying with Open Cut Method.
- uPVC Pipe (Dia 200mm ~ 300mm) Lying with Open Cut Method
- Pump House Construction.
- RCC Chamber & Equipment Installation.
- Pre Commissioning, Commissioning.
-
KMG BRIDGE CONSTRUCTION PROJECT
Main Contractor: OSJI JV
Type of Works:- Temporary Facilities Works Site Office, Accommodation, Steel Fence and Others Works
- RCC Block, Jetty are slope protection works
- RCC Retaining Wall
- Pile Cap, Pier and Pier Head Works.
- SPSP Foundation Works.
-
MRT LINE-06, PACKAGE: CP_ 03, 04, 05 & 06
Main Contractor: ITALIAN THAI DEVELOPMENT_ITD, TAA JV, SMCC-ITD JV
Type of Works:- Temporary Facilities Works Site Office, Accommodation, Steel Fence, Road, Sewer Line and Others Works
- Pile Cap, Pier and Pier Head Works.
- Portal Pier Works
- Two Cell Works
- Balance Cantilever Works
-
BANGA BONDHU RAILWAY BRIDGE CONSTRUCTION WORK
Main Contractor: OTJ JV
Type of Works:- Temporary Facilities Works Site Office, Accommodation, Steel Fence, Road, Sewer Line and Others Works
- RCC Retaining Wall
-
HSIA 3rd TERMINAL PROJECT
Main Contractor: AVIATION DHAKA CONSORTIUM- Utility and Drainage Work Pkg 2, Part 01
-
KARNAPHULI WATER SUPPLY PROJECT (PHASE-2/PACKAGE W-1)
Main Contractor: KOLON GLOBAL-KUBOTA JV
Type of Works:- Nasirabad Reservoir Construction Project, Capacity 24,800 cum
- Yard Piping.
- WDMC Building Construction Work.
-
KARNAPHULI WATER SUPPLY PROJECT (PHASE-2/PACKAGE W-2)
Main Contractor: KUBOTA-KOLON GLOBAL JV
Type of Works:- DI Pipe (Dia 500mm ~ 1200mm) Lying with Open Cut Method.
- RCC Chamber & Equipment Installation.
- Pre Commissioning, Commissioning.
-
BHANDAL JHURI WATER TREATMENT PLANT AND PIPELINE PROJECT
Main Contractor: TAEYOUNG ENGINEERING AND CONSTRUCTION CO. LTD.
Type of Works:- DI Pipe (Dia 500mm ~ 900mm) Lying with Open Cut Method.
- RCC Chamber & Equipment Installation.
- Pre Commissioning, Commissioning.
I have passion to work in Civil Engineering arena. I am hard worker, honest, trustworthy and adaptive to any multi-cultural environment. I hereby declare that all the information given above is correct and authentic.
Чтобы открыть контактную информацию соискателя, нужно зарегистрироваться и оплатить услугу "Доступ к базе резюме".