Fișier CV
MM
Lucrător

Gender Masculin

address Dondușeni

Pentru a vedea datele de contact ale candidatului trebuie să vă înregistrați și să achitați pentru "Acces la baza de CV‑uri".

Fișier CV încărcat

Cv Preview

Acest CV este publicat ca fișier. Acum vizualizați versiunea text a acestuia, care poate fi ușor diferită de original.

ABOUT ME

To make a position for myself in the competitive corporate world and contribute to achieving the goals on both professional and personal level.

WORK EXPERIENCE

20 OCT 2013 – CURRENT
Dhaka, Bangladesh
JOB RESPONSIBILITY:

  • Lead all the project works.
  • Bid documents preparation & submission.
  • Check and follow the condition of Contract [FIDIC] with Clients.
  • To assist in preparation of the budget & master program of the work and push sub-contractor for the procurement and preparation for upcoming activities in advances to meet time line.
  • To prepare IPC, Measurement records etc.
  • To prepare Daily Report, Weekly Report, Monthly Report & Work Program.
  • To prepare shop drawing, method statement, work plan for execution of work in field level.
  • During the work solve the entire related problem discussing with client, consultant & others.
  • Responsible for company profit.

1 JAN 2013 – 31 OCT 2013
HEAD OFFICE: No-60B, Jln SS 15/4, Section 15, 47500 Subang Jaya, Selangor D.E., Malaysia
Project Cost Controller BRT Builders Sdn Bhd (A Malaysian based Company)
JOB RESPONSIBILITY:

  • Reporting to the Project Manager.
  • Preparation of Work Schedule for implementing the project within the time.
  • Preparation of S-Curve.
  • Preparation of As-Built drawing of various structures.
  • Estimation & Requisition for Construction Materials.
  • Preparation of Bar Schedule for whole Reservoir, Pump House, Elevated Tank along with Drains, Retaining walls, Guide walls, RCC Railing & Post, Fencing, Guard & Electrical House etc.
  • Assisting to prepare Interim Payment Certificate (IPC).
  • Preparation of Daily Site Report & Monthly Progress Report.

1 MAR 2011 – 15 DEC 2012
Office: Level-18 UTC Tower, Kawranbazar, Dhaka, Bangladesh
Deputy Assistant Director Shaco International
JOB RESPONSIBILITY:

  • Reporting to the Assistant Director.
  • Preparation of Bid documents.
  • Land Development and Slope Protection Works.
  • Preparation of As-Built drawing of various structures.
  • Estimation & Requisition for Construction Materials.
  • Preparation of Bar Schedule for whole Reservoir, Pump House, Elevated Tank along with Drains, Retaining walls, Guide walls, RCC Railing & Post, Fencing, Guard & Electrical House etc.
  • Assisting to prepare Interim Payment Certificate (IPC).
  • Preparation of Daily Site Report & Monthly Progress Report.

1 SEP 2009 – 28 FEB 2011
Office: Rowshan Tower (4th floor) 152/2/A-2, West Panthopath, Dhaka, Bangladesh
Project Engineer Hivertech Limited
JOB RESPONSIBILITY:

  • Implementation of Plans and Direction of Site Management.
  • To follow the quality of works as per Standards & Specification of contract.
  • To check the quality of construction materials.
  • Preparing Bar Schedule & monthly material consumption.
  • Estimation & requisition of construction materials.
  • Supervision of bar binding & formwork fixing.
  • Planning & Man power scheduling to execute the work by collecting work report.
  • Checking of bill of suppliers.
  • Evaluation of the offers of contractors and submission to the authority.
  • Preparing daily & monthly report.
  • Co-ordination with different suppliers to get equipment’s and materials on time and good condition.

EDUCATION AND TRAINING

23 FEB 2005 – 15 JUL 2009
Rajshahi, Bangladesh
Bachelor of Science in Civil Engineering (4-Years Bachelor)
Rajshahi University of Engineering and Technology (RUET), Bangladesh
Field of study: Civil Engineering
Final grade: 3.23 (Out of 4.0)
Number of credits: 160
Thesis: Failure behavior of PVC pipe due to Impact Load

15 JUL 2002 – 30 SEP 2004
Barisal, Bangladesh
Higher Secondary Certificate _HSC
Bauphal Govt Collage, Patuakhali
Field of study: Science
Final grade: 4.20 (out of 5.00)

1 JAN 2000 – 31 DEC 2001
Barisal, Bangladesh
Secondary School Certificate _SSC
Charfession T B High School, Bhola
Field of study: Science
Final grade: 4.13 (Out of 5.00)

LANGUAGE SKILLS

MOTHER TONGUE(S): Bangla
Other language(s):

  • English
    • Listening: C2
    • Spoken production: C2
    • Reading: C2
    • Spoken interaction: C2
    • Writing: C2
  • Hindi
    • Listening: C1
    • Spoken production: B2
    • Reading: A1
    • Spoken interaction: B2
    • Writing: A1

Levels: A1 and A2: Basic user; B1 and B2: Independent user; C1 and C2: Proficient user

ADDITIONAL INFORMATION

Hobbies and interests

  • Reading book.
  • Listening song.
  • Social media browsing.
  • Watching Movie and Drama.
  • Meeting with Family and Friends.

Management and leadership skills
Post Graduate Diploma in Project Management PGDPM
Academy Name: World Academy.
PGDPM (Level - 7, Credit 120)
Result: 3.39 (Out of 4.00) B+
Learner Reg No.: WA-22-02-1995
Certificate No.: 209312
Issue Date: May 5, 2023

Project Management Professional
Academy Name: Ressotta Academy.
Total Training Duration: 40 hr.
Exam not yet completed.

Networks and memberships
1 JAN 2011 – CURRENT
Dhaka
MIEB 30184 Institute of Engineers Bangladesh IEB
Membership No.: 30184

Projects

  1. DWSSDP ICB 02.6 under DWASA
    Main Contractor: Ludwig Pfeiffer Hoch- und Tiefbau GmbH & Co. KG
    Type of Works:

    • HDPE Pipe (Dia 75mm ~ 315mm) Lying with HDD & Open Cut Method.
    • Service Connection/House Connection.
    • RCC Chamber & Equipment Installation.
    • Pre Commissioning, Commissioning
    • All others testing like environment, water test from BUET.
  2. FIRST DHAKA ELEVATED EXPRESSWAY (FDEE) PROJECT
    Main Contractor: ITALIAN THAI DEVELOPMENT ITD
    Type of Works:

    • Temporary Facilities Works Site Office, Accommodation, Steel Fence and Others Works
    • Main Works: Construction of Pile Cap
  3. WELL FIELD CONSTRUCTION PROJECT
    Main Contractor: HYUNDAI ROTEM COMPANY _HRC
    Type of Works:

    • DI Pipe (Dia 400mm ~ 1200mm) Lying with Open Cut Method.
    • uPVC Pipe (Dia 200mm ~ 300mm) Lying with Open Cut Method
    • Pump House Construction.
    • RCC Chamber & Equipment Installation.
    • Pre Commissioning, Commissioning.
  4. KMG BRIDGE CONSTRUCTION PROJECT
    Main Contractor: OSJI JV
    Type of Works:

    • Temporary Facilities Works Site Office, Accommodation, Steel Fence and Others Works
    • RCC Block, Jetty are slope protection works
    • RCC Retaining Wall
    • Pile Cap, Pier and Pier Head Works.
    • SPSP Foundation Works.
  5. MRT LINE-06, PACKAGE: CP_ 03, 04, 05 & 06
    Main Contractor: ITALIAN THAI DEVELOPMENT_ITD, TAA JV, SMCC-ITD JV
    Type of Works:

    • Temporary Facilities Works Site Office, Accommodation, Steel Fence, Road, Sewer Line and Others Works
    • Pile Cap, Pier and Pier Head Works.
    • Portal Pier Works
    • Two Cell Works
    • Balance Cantilever Works
  6. BANGA BONDHU RAILWAY BRIDGE CONSTRUCTION WORK
    Main Contractor: OTJ JV
    Type of Works:

    • Temporary Facilities Works Site Office, Accommodation, Steel Fence, Road, Sewer Line and Others Works
    • RCC Retaining Wall
  7. HSIA 3rd TERMINAL PROJECT
    Main Contractor: AVIATION DHAKA CONSORTIUM

    • Utility and Drainage Work Pkg 2, Part 01
  8. KARNAPHULI WATER SUPPLY PROJECT (PHASE-2/PACKAGE W-1)
    Main Contractor: KOLON GLOBAL-KUBOTA JV
    Type of Works:

    • Nasirabad Reservoir Construction Project, Capacity 24,800 cum
    • Yard Piping.
    • WDMC Building Construction Work.
  9. KARNAPHULI WATER SUPPLY PROJECT (PHASE-2/PACKAGE W-2)
    Main Contractor: KUBOTA-KOLON GLOBAL JV
    Type of Works:

    • DI Pipe (Dia 500mm ~ 1200mm) Lying with Open Cut Method.
    • RCC Chamber & Equipment Installation.
    • Pre Commissioning, Commissioning.
  10. BHANDAL JHURI WATER TREATMENT PLANT AND PIPELINE PROJECT
    Main Contractor: TAEYOUNG ENGINEERING AND CONSTRUCTION CO. LTD.
    Type of Works:

    • DI Pipe (Dia 500mm ~ 900mm) Lying with Open Cut Method.
    • RCC Chamber & Equipment Installation.
    • Pre Commissioning, Commissioning.

I have passion to work in Civil Engineering arena. I am hard worker, honest, trustworthy and adaptive to any multi-cultural environment. I hereby declare that all the information given above is correct and authentic.

Pentru a vedea datele de contact ale candidatului trebuie să vă înregistrați și să achitați pentru "Acces la baza de CV‑uri".